Baker Botts Represents Steelhead LNG in Transaction for the Front-End Engineering and Design of two At-Shore LNG™ hulls
On September 19, 2018, at the Gastech Conference in Barcelona, representatives from Steelhead LNG, Huu-ay-aht First Nations, and Hyundai Heavy Industries’ Shipbuilding Division formalized the contract for the front-end engineering and design (FEED) of two At-Shore LNG™ hulls as part of phase one of the Kwispaa LNG Project. Each hull is expected to measure 340 metres in length and 60 metres wide and feature five individual tanks that provide approximately 280,000 metres3 of internal LNG storage.